In Sec. 2.3.4, a situation with a high-priority process, H, and a low-priority process, L, was…

In Sec. 2.3.4, a situation with a high-priority process, H, and a low-priority process, L, was described, which led to H looping forever. Does the same problem occur if roundrobin scheduling is used instead of priority scheduling? Discuss.